We are in charge of the elaboration of projects of Activities of very diverse typology, of its processing and the relation with the Administrations.
In this case, our technical team is an expert in the preparation of projects for the opening of establishments for industrial, public, commercial or service activities, we prepare all the necessary documentation to obtain the permits for the opening. of its new business, carrying out the procedures and procedures before the administration and managing the supply contracts.
We are a team of professionals with many years of experience in drafting projects and technical preliminary projects for obtaining activity licenses. We prepare the report and the necessary plans for the file and we are responsible for all the management of the project, whether it is a harmless activity or whether it has an environmental impact and must be inspected by a control body.
Simultaneously or later, we can manage the works and installations as well as ensure compliance with the conditions expressed in the technical project by assuming the technical direction.
An activity project is a document made and signed by a competent technician such as an engineer, which is required to obtain the corresponding municipal license, which allows the opening of a business or activity in a specific premises or premises.
This project must justify that both the establishment, the planned facilities, the design of the premises, as well as the development of the activity comply with the corresponding regulations and regulations.
An Activity Project contains a Report, Specifications, Budget, Security Study and Plans indicating all the characteristics of the establishment, dimensions, distribution, modifications to be made, facilities, cost of the works. As well as a description of the activity to be developed.
The Activity Project includes all the regulations that apply to it, depending on the case: Technical Building Code, Accessibility, Basic Document for Fire Protection or Fire Safety Regulations in Industrial Establishments, Low Voltage Electrical Regulations , Regulation Thermal installations in the building, etc …
Normally, the procedure must be prior to or in parallel with the Works Project, in the event that the premises must be enabled to install the activity, in order to avoid inconsistencies between the project and the execution.
When the premises are in condition to carry out the activity, or the activity does not require any type of works for the start-up of the new business, the documentation must be submitted 30 days in advance to the start of the activity.
The documentation required for the opening project depends on the type of activity, since depending on the characteristics of the activity, compliance with a specific regulation or another regulation of the activity must be justified. . Although they are similar, the steps to follow may vary between municipalities.
Harmless activity without works through Prior Environmental Communication
Harmless activity with works through Prior Environmental Communication
Qualified activity without works by means of an Environmental License
07/05/2022